Cord fabric inspection
[ 2023-11-23 ]
Where can I go to get a complete solution for cord fabric testing? BAIJIAN Material Testing Agency provides cord fabric testing services. It is a national high-tech enterprise, a third-party material laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments and scientific research. The team is strong, adhering to the concept of scientific research and dedication, and is engaged in performance testing, non-standard testing, unknown substance analysis and identification, industrial problem diagnosis and analysis, composition testing, failure analysis, corrosion analysis, etc. Test reports will be issued in 7-15 working days, supporting 2D The code system checks the authenticity, and multiple laboratory branches across the country support door-to-door sampling/sample delivery testing services nationwide.
Detection cycle: 7-15 working days
Testing fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment.
Rubber cord fabric, nylon cord fabric, glass cord fabric, polyester cord fabric, tire cord fabric, dipped cord fabric, nylon cord fabric, polyester cord fabric , industrial cord fabrics, etc.
Defect detection, third-party testing, glue amount testing, single-line fatigue testing, shear strength testing, tensile strength testing, tear strength testing, layer Inter-bonding strength testing, peeling strength testing, stiffness testing, breaking load testing, thickness testing, twist testing, apparent density testing, linear shrinkage testing, heat resistance testing, joint strength testing, etc. (For more requirements, please consult an engineer for details, who will answer you one-on-one.)
1. Sales report. (Sales need to provide third-party testing reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)
2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party testing data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)
3. Improve products quality. (Discover problems with your own products through comparison of third-party testing data, improve product problems, improve quality, and reduce production costs)
4. Use of scientific research paper data.
GB/T 330-1994 cotton cord fabric
GB/T 9101-2017 Nylon 66 dipRubber cord fabricGB/T 9102-2016 Nylon 6 dipped cord fabric
GB/T 14905-2009 Determination of bonding strength between layers of rubber and plastic hoses
p>
GB/T 19390-2014 Polyester dipped cord fabric for tires
GB/T 31334.5-2017 Test methods for dipped canvas Part 5: Tensile properties
GB/T 32105-2015 Technical conditions and evaluation methods for dipped polyester cord fabricsGB/T 32109-2015 Test methods for adhesion and peeling properties of dipped yarns and cord fabrics
GB/T 33099-2016 Determination of stiffness of rubber-impregnated frame materials by three-point bending methodGOST 23785.1-2001 Method for determination of breaking load and elongation of cord fabrics
GOST 23785.3-2001 Method for determination of twist of cord fabric
GOST 23785.4-2001 Method for determination of linear dimensions, warp and weft density, and surface density of cord fabric
GOST 23785.5-2001 Determination of shrinkage of cord fabric Method
GOST 23785.6-2001 Method for determination of heat resistance of cord fabric
GOST 23785.7-1989 Method for determination of joint strength of cord fabric and rubber
HG/T 4612-2014 Tear-resistant dipped steel cord fabric for conveyor belts
HG/T 5650-2019 Dip rayon cord fabric
1. A collectively owned testing institution with complete qualifications and scientific, fair and accurate test reports.
2. Multiple laboratory branches are located across the country, supporting door-to-door sampling/sending samples for testing.
3. The testing cycle is short, the testing cost is low, and the experimental plan is more complete.
4. For initial inspection of samples, no testing fees will be charged during the initial inspection.
5. The test report supports scanning the QR code to check the authenticity.
1. Send samples. (Communicate with engineers, submit your own testing requirements and send samples to our research institute)
2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)
3. Quotation. (After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment)
4. Both parties confirm, sign a confidentiality agreement, and start the experiment.
5. It takes 7-15 working days to complete the experiment.
6. Mail the test report and provide post-service.
The above is the relevant introduction to cord fabric testing. If you have other testing needs, you can consult the laboratory engineer to help you solve it.