400-101-7153|service@Baijiantest.com

上海百检

Home > NEWS > BLOG

Energy efficiency testing of civil construction engineering 260328 testing

[ 2023-12-05 ]

Energy conservation testing is a technical supervision method. One of the responsibilities of energy conservation testing institutions is to regularly report the testing results to the energy conservation competent department and higher-level energy conservation testing institutions, propose relevant suggestions, and provide scientific analysis of the energy utilization status of energy consuming units to the energy conservation competent department. A large amount of data can more scientifically reflect the equipment level and energy consumption level of the main energy consuming equipment. A large amount of scientific data can enable energy-saving authorities to deploy, coordinate, serve, and supervise energy-saving work at a deeper level, in order to gradually narrow the gap between China's energy utilization rate and international advanced water levels, reduce energy consumption, protect the environment, and ensure the sustainable development of China's economy. Energy conservation testing is a law enforcement activity. In order to prevent low-level redundant construction and promote the upgrading and upgrading of production processes, equipment, and products, the country has announced multiple batches of obsolete product catalogs in accordance with relevant national laws and regulations. An important task of energy-saving testing is to implement government regulations and strengthen energy-saving testing, which can effectively eliminate outdated production capacity, outdated process equipment, and outdated products. Article 13 of the Energy Conservation Law stipulates that "it is prohibited to build industrial projects with outdated technology, high energy consumption, and serious energy waste." Article 25 stipulates that, Units and inpiduals that produce and sell energy consuming products and use energy consuming equipment must, within the period specified by relevant government departments, stop producing and selling energy consuming products that have been explicitly eliminated by the state, stop using energy consuming equipment that has been explicitly eliminated by the state, and shall not transfer the eliminated equipment to others for use. Relevant testing standards GB 50243 "Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Engineering" GB/T 34010 "Method for Determination of Building Air Tightness - Fan Pressure Method" GB 50411 "Code for Acceptance of Construction Quality of Building Energy Efficiency" GB/T 5700 "Lighting Measurement Method" GB/T 10180 "Code for Thermal Performance Testing of Industrial Boilers" GB/T 10870 "Performance Testing Method for Steam Compression Cycle Cold Water Heat Pump Units" GB 50591 "Code for Construction and Acceptance of Clean Rooms" JGJ/T 132 Energy Efficiency Testing Standards for Residential Buildings (GJ/T 177), Energy Efficiency Testing Standards for Public Buildings (DB11/T 555), and Site Inspection Standards for Energy Efficiency Engineering in Civil Buildings (DB11/T 555)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

Reliable Service
Accurate Results At A Reasonable Price
Professional Testing Organization
Global Partner Organizations
Service Objectives
Customer First, Honesty First
Online Service
Service Hotline

Service Hotline

400-101-7153

WECHAT