patch detection
[ 2023-11-23 ]
Where to go for patch testing? BAIJIAN material testing agency can provide patch testing services. It is a formal third-party material testing center in China, a collectively owned scientific research institution, a high-tech enterprise, a CMA certification agency, and a third-party material laboratory engaged in For various material performance testing, industrial problem diagnosis and analysis, unknown substance analysis and identification, elemental impurity analysis, non-standard test testing, failure analysis, etc., the laboratory has complete instruments and a strong R&D team. Test reports can be issued in 7-15 working days. The test report issued is scientific, fair and accurate.
Detection cycle: 7-15 working days
Testing fee: Engineers will quote based on the customer’s testing needs and the complexity of the experiment.
Wall patches, plaster patches, hand-made patches, denim patches, embroidered patches, Velcro patches, embroidered patches, etc.
Compatibility test, skin irritation test, adhesion test, color fastness test, tensile test, skin sensitization test, etc.
The above are some of the testing items. For other testing needs, please consult the online engineer to provide you with one-on-one answers.
1. Develop new products to help you shorten the research and development cycle and reduce research and development costs.
2. Improve product quality, improve the quality of your own products through testing and comparison, improve quality, and reduce production costs.
3. Sales use, through test reports, let more customers trust their products and better understand the characteristics of their products.
4. Use of scientific research paper data.
5. Used for product import and export and bidding/competition.
1. BAIJIAN is a collectively owned testing institution.
2. Initial inspection samples.
3. Multiple laboratory branches across the country support door-to-door sampling/send sample testing.
4. The testing cycle is short, the testing cost is low, and the experimental plan is complete.
5. Complete qualifications, complete laboratory equipment, and a strong scientific research team.
1. Send samples
2. Initial inspection samples
3. Quotation
4. Both parties confirm, sign a confidentiality agreement, and start the experiment
5. It will take 7-10 working days to complete the experiment
6. Issuance of test report and post-service.
The above is the relevant introduction to patch testing. If you have other testing questions, you can consult the laboratory engineer to help you answer them.