Twist rate test after washing
[ 2023-11-23 ]
Where can I go to test the twist rate after washing? BAIJIAN Material Testing Agency can provide twist rate testing services after washing. It is a CMA qualification certification agency, high-tech enterprise, and third-party material laboratory, aiming at problems encountered in product development and quality control. We provide comprehensive solutions for component testing, product testing, product testing, instrument testing, etc., with complete equipment and a strong scientific research team. Test reports can be issued within 7-15 working days. We support scanning QR codes to check authenticity, and door-to-door sampling and shipping nationwide. Sample testing service, short testing cycle, low testing cost, scientific and accurate testing data!
Testing cycle: 7-15 jobs Day
Testing fee: Engineers develop experimental plans and quote based on customer testing needs and experimental complexity.
T-shirts, fabrics, fabrics, clothing, woven fabrics, etc.
Test item: Twist rate test after washing
1. Sales and use. (Sell your own products and issue third-party testing reports to make customers more confident in the quality of your products)
2. R&D and use. (During the research and development process, some difficult problems are encountered, and the problems are solved through test report data, thereby shortening the research and development cycle and reducing research and development costs)
3. Improve product quality. (By comparing test data, we can discover the problems of our own products, improve product quality, and reduce production costs)
4. Use of scientific research paper data.
5. Bidding and bidding (BAIJIAN has a relatively short testing cycle, low testing costs, and high recognition, and is especially suitable for bidding)
1. BAIJIAN is a collectively owned testing institution.
2. Initial inspection samples.
3. Multiple laboratory branches across the country support door-to-door sampling/send sample testing.
4. The testing cycle is short, the testing cost is low, and the experimental plan is complete.
5. Complete qualifications, complete laboratory equipment, and a strong scientific research team.
6. Support MSDS writing service in 36 languages
1. Send samples
2. PreliminaryInspect samples
3. Quotation
4. Both parties confirm, sign a confidentiality agreement, and start the experiment
5. Complete the experiment in 7-15 working days
6. Issue test report and provide follow-up service.
The above is the relevant introduction to the twist rate test after water washing. If you have other needs, you can consult the laboratory engineer to help you answer it.