According to the requirements of GB/T 20247-2006, the volume of the newly built reverberation room shall not be less than 200m ³。 The gradually decaying sound field in the reverberation room should be fully diffused. To achieve satisfactory diffusion, fixed or suspended diffusers or rotating diffusers need to be installed regardless of the shape of the reverberation chamber. The test piece is installed according to one of the installation methods in Appendix B, with the sound-absorbing surface facing upwards and placed in a rectangular shape, with an area of approximately 10-12 square meters. Strictly operate and measure reverberation specimens in open spaces and with specimens according to standard requirements, and then calculate the sound absorption coefficient and noise reduction coefficient. The sound insulation room is specially designed according to the requirements of the national standard GB/T 19889.3-2005. Use two adjacent reverberation rooms, one as the sound source room and the other as the receiving room. If one side of the specimen has significantly higher sound absorption than the other side, the high absorption side should face the sound source room, and the sound source room should be equipped with a diffuser. There is a common wall between the two rooms, and there is an installation hole on the wall, with an area of about 10 square meters for installing measuring materials. The edge of the hole is made of steel tooling, and the test pieces are placed in the middle of the hole during installation, meaning that the depth of the holes on both sides is basically the same P>
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in ChinaNumber